ONGC JV restarts production at Cauvery Basin
ONGC and its partners have resumed production at the PY-3 Field in the Cauvery Basin after a 14-year shutdown. The field, initially operational in 1997, ceased production in 2011. A revised multi-phase development plan was implemented, with Phase I now complete, to revive the field’s output. Hardy Exploration & Production operates the block.